Form 21 | Related Doc | Date Submitted: | 6/23/2010 | MIT Assigned By: | ONYSKIW, DENISE | Date Recv'd: | 6/30/2010 | API number: | 05-103-05656 | DocNum: | 2617100 | Facility Status: | SI | Operator Information: | Oper. No. | 16700 | Operator: | CHEVRON U S A INC | Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 | Type Of Facility: | WELL | Well Status: SI | Well Name/No. | UNION PACIFIC | Operator contact: | DIANE L PETERSON | Location: | | qtrqtr: SWNE | section: 29 | township: 2N | range: 102W | meridian: 6 |
| MIT Details: | Test Type: | 5-YEAR UIC TEST | Test Date: | 6/16/2010 | Field Rep: | | Approved Date: | 6/30/2010 | Approved by: | ONYSKIW, DENISE | Last Approved MIT: | N/A | Injection/Producing Formation Zones: | WEBR | Perforation Interval: | NA | Open Hole Interval: | 5650-6290 | Bridge/Cement Plug Depth: | | Tubing Size: | 2.875 | Tubing Depth: | 5605.4 | Top Packer Depth: | 5538.7 | Multiple Packers: | Y | | Condition of approval: | | Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | | 5 MIN CASE | | CASE BEFORE | | FINAL CASE | 800 | FINAL TUBE | | INITIAL TUBE | | LOSS OR GAIN | 0 | START CASE | 800 |
| Channel Test | Test Date | CBL | 6/10/2010 |
|
|
|
|
|
|