Field Inspection Comments And Observations |
Insp. Comment | Inspection/Violation Comments |
ACTION | CORRECTLY PLACARD TANKS / SUBMIT A SUNDRY TO COGCC ENGINEERING EXPLAINING WHY YOU HAVE A TANK CONNECTED TO THE BRADENHEAD |
GENHOUSE | TANKS INCORRECTLY PLACARDED / TEMPORARY TANK TO BRADENHEAD |
MISC | PLUNGER LIFT SYSTEM /SIGN /FENCE |
TANKBAT | 4 300 BBL UPRIGHTS/ STEEL BERM /PLACARDED /4 HORIZONTAL SEPARATORS / BIRDGUARD /BERM / EMISSIONS STACK / 2 METER RUNS |