Field Inspection Comments And Observations |
Insp. Comment | Inspection/Violation Comments |
ACTION | RESIZE BATTERY BERM / REPAIR ALL LEAKS / REMOVE ALL OIL SATURATED SOIL |
FIREWALL | BATTERY BERM UNDERSIZED FOR TANK / |
MISC | PLUNGER LIFT SYSTEM / SIGN |
SPILCOM | OIL INSIDE BERM AND INSIDE VERTICAL GAS PROCESSOR SHED / OIL SATURATED SOIL INSIDE BATTERY BERM / OIL SATURATED SOIL AT WELLHEAD |
TANKBAT | 2 300 BBL URIGHTS / BERM / SIGN / VERTICAL GAS PROCESSOR / VERTICAL GAS PROCESSOR SHED / BIRDGUARD / BERMED / METER RUN / EMISSIONS STACK |