Field Inspection Comments And Observations |
Insp. Comment | Inspection/Violation Comments |
ACTION | RESIZE BERMS / PLACE BERM AROUND HORIZONTAL SEPARATOR / PLACE GUARDS ON SEPARATOR TO PREVENT SMALL ANIMALS AND BIRDS FROM ENTERING SEPARATOR/ REMOVE UNUSED VERTICAL GAS PROCESSOR / REMOVE TRASH AND JUNK FROM WELL AND BATTERY SITE / CLOSE THIEF HATCHES / DISCONTINUE VENTING GAS THROUGH TANK / PLACE PLACARDS ON TANKS ACCORDING TO RULE 210 / PLACE SIGN ON WELLHEAD / CONTROL WEEDS ON WELL AND BATTERY SITE / REPAIR ALL LEAKS / REMOVE ALL OIL SATURATED SOIL |
FIREWALL | NO BERM ON HORIZONTAL SEPARATOR / NO BIRDGUARDS ON HORIZONTAL SEPARATOR / |
GENHOUSE | BUCKETS BY HORIZONTAL SEPARATOR / UNUSED VERTICAL GAS PROCESSOR / NO PLACARDS ON BATTERY TANKS / THIEF HATCH OPEN ON UPRIGHT / WEEDS ON WELLSITE / NO SIGN ON WELLHEAD / BATTERY BERM UNDERSIZED FOR TANKS |
MISC | PLUNGER LIFT SYSTEM |
SPILCOM | VENTING GAS TO PRODUCED WATER TANK / OIL SATURATED SOIL INSIDE BATTERY BERM / OIL SATURATED SOIL AT VERTICAL GAS PROCESSOR |
TANKBAT | 300UPRIGHT / STEEL TANK / BERMED / SIGN / HORIZONTAL SEPARATOR / VERTICAL GAS PROCESSOR / MANIFOLD / METER RUN |