Field Inspection Comments And Observations |
Insp. Comment | Inspection/Violation Comments |
ACTION | REPAIR ALL LEAKS ./ REMOVE ALL OIL SATURATED SOIL ./ CONTROL AND REMOVE WEEDS |
GENHOUSE | WEEDS / ACCESS PANEL LEAKING / SOUTH UPRIGHT LEAKING / WOOD PLANK SOUTH OF TRANSFER PUMP |
SPILCOM | OIL SATURATED SOIL INSIDE BERM / OIL SATURATED SOIL OUTSIDE BERM |