Form 21 | Related Doc | Date Submitted: | 1/24/2007 | MIT Assigned By: | ADKINS, JAIME | Date Recv'd: | 1/24/2007 | Facility ID: | 150200 | DocNum: | 200103930 | Facility Status: | AC | Operator Information: | Oper. No. | 16700 | Operator: | CHEVRON U S A INC | Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 | Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC | Facility Name | M.B. LARSON A | Operator contact: | DIANE PETERSON | Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
| MIT Details: | Test Type: | 5-YEAR UIC TEST | Test Date: | 1/17/2007 | Field Rep: | CARVER, FRANKI | Approved Date: | 2/9/2007 | Approved by: | ADKINS, JAIME | Last Approved MIT: | N/A | Injection/Producing Formation Zones: | WEBR | Perforation Interval: | NA | Open Hole Interval: | 6495-6772 | Bridge/Cement Plug Depth: | | Tubing Size: | 2.875 | Tubing Depth: | 6515' | Top Packer Depth: | 6442 | Multiple Packers: | Y | | Condition of approval: | | Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | 750 | 5 MIN CASE | 750 | CASE BEFORE | 0 | FINAL CASE | 750 | FINAL TUBE | 0 | INITIAL TUBE | 0 | LOSS OR GAIN | 0 | START CASE | 750 |
| Channel Test | Test Date | CBL | 1/11/2007 |
|
|
|
|
|
|