Field Inspection Comments And Observations |
Insp. Comment | Inspection/Violation Comments |
ACTION | CLEAN UP OIL SATURATED SOIL. REMOVE JUNK. REPAIR VALVE TO PREVENT LEAKAGE ON SEPARATOR. UPDATE SIGNS TO REFLECT CURRENT OPEATOR INFORMATION. |
FIREWALL | BERMS APPEAR ADEQUATE |
GENHOUSE | MISC JUNK (PIPING, ETC) AROUND WELLSITE |
MISC | PLUNGER LIFT |
SPILCOM | OIL SATURATED SOIL INSIDE TANK BERM. WATER LEAKING AROUND VALVE ON SEPARATOR. |
TANKBAT | (2) 400 BBL PROD TANKS, (1) HORIZ SEPARATOR, (1) 300 BBL PROD WATER TANK, (1) GMR |
WELLSIGN | SIGN POSTED AT WELL AND BATTERY HAS PREVIOUS OPERATOR INFORMATION |