Form 21 | Related Doc |
Date Submitted: | 12/21/2011 | MIT Assigned By: | KOEHLER, BOB |
Date Recv'd: | 4/4/2012 | Facility ID: | 150200 |
DocNum: | 1771798 | Facility Status: | AC |
Operator Information: |
Oper. No. | 16700 |
Operator: | CHEVRON USA INC |
Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 |
Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC |
Facility Name | LARSON, F V |
Operator contact: | DIANE L. PETERSON |
Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
|
MIT Details: |
Test Type: | VERIFICATION OF REPAIRS |
Repair Type: | CASING LEAK |
Repair Desc: | CASING REPAIR-WELL BORE FULL OF 10.5 TO 10.8# CALCHLORIDE FOR MIT TEST. WELL WILL BE TA STATUS - DUE TO P&A IN EARLY SPRING 2012. |
Test Date: | 12/16/2011 |
Field Rep: | |
Approved Date: | 4/25/2012 |
Approved by: | KOEHLER, BOB |
Last Approved MIT: | 5/10/2006 |
Injection/Producing Formation Zones: | WEBR |
Perforation Interval: | NA |
Open Hole Interval: | 5806-6402 |
Bridge/Cement Plug Depth: | NA |
Tubing Size: | 2.875 |
Tubing Depth: | 5756 |
Top Packer Depth: | 5420 |
Multiple Packers: | Y |
|
Condition of approval: |
OPERATOR COULD NOT FIND ORIGINAL CHART. IT WAS SCANNED AND SENT TO ARCHIVE. ACCEPTED SCAN OF CHART. (OOPS-Paper appproved 4/24/2012 but BK forgot to approve electronic version till 8/5/2013!) |
Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | | 5 MIN CASE | | CASE BEFORE | | FINAL CASE | 400 | FINAL TUBE | | INITIAL TUBE | | LOSS OR GAIN | 0 | START CASE | 400 |
| No channel test. |
|
|
|
|