Skip to Main Content

Incident Search

COGIS - Mechanical Integrity Test Report
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-07537CARNEY C T
29 X 34
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
1/1/2024
RANGELY
72370
RIO BLANCO  103
NWSE 34 2N102W 6
314912View Related Related
 
Form 21View Related Related View DocsDoc
Date Submitted:12/29/2010MIT Assigned By:KOEHLER, BOB
Date Recv'd:1/3/2011Facility ID: 150200
DocNum:1771068Facility Status:AC
Operator Information:
Oper. No.16700
Operator:CHEVRON USA INC
Address:6001 BOLLINGER CANYON RD  SAN RAMON  CA 94583
Type Of Facility:UIC ENHANCED RECOVERYWell Status: AC
Facility NameCARNEY C T
Operator contact:DIANE L  PETERSON
Location:  qtrqtr: SENE section: 16 township: 2N range: 103W meridian: 6
MIT Details:
Test Type:VERIFICATION OF REPAIRS
Repair Type:TUBING/PACKER LEAK
Repair Desc:REPLACE TUBING AND PACKER
Test Date:12/22/2010
Field Rep:
Approved Date:1/4/2011
Approved by:KOEHLER, BOB
Last Approved MIT:5/14/2008
Injection/Producing Formation Zones:WEBR
Perforation Interval:5630-6338
Open Hole Interval:NA
Bridge/Cement Plug Depth:NA
Tubing Size:2.875
Tubing Depth:5978
Top Packer Depth:5348
Multiple Packers:Y
 
Condition of approval:
Test Data:Wellbore Channel Test:
Reading TypePressure
10 MIN CASE
5 MIN CASE
CASE BEFORE
FINAL CASE810
FINAL TUBE
INITIAL TUBE
LOSS OR GAIN0
START CASE810
No channel test.