Form 21 | Related Doc | Date Submitted: | 11/23/2009 | MIT Assigned By: | KOEHLER, BOB | Date Recv'd: | 11/23/2009 | Facility ID: | 150200 | DocNum: | 1769870 | Facility Status: | AC | Operator Information: | Oper. No. | 16700 | Operator: | CHEVRON U S A INC | Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 | Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC | Facility Name | COLTHARP J E | Operator contact: | DIANE L PETERSON | Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
| MIT Details: | Test Type: | SI/TA MAINTENANCE STATUS | Test Date: | 2/4/2009 | Field Rep: | | Approved Date: | 12/17/2009 | Approved by: | KOEHLER, BOB | Last Approved MIT: | 9/20/2005 | Injection/Producing Formation Zones: | WEBR | Perforation Interval: | NA | Open Hole Interval: | 5715-6342 | Bridge/Cement Plug Depth: | NA | Tubing Size: | 2.875 | Tubing Depth: | 6284 | Top Packer Depth: | 5566 | Multiple Packers: | Y | | Condition of approval: | | Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | | 5 MIN CASE | | CASE BEFORE | | FINAL CASE | 820 | FINAL TUBE | | INITIAL TUBE | | LOSS OR GAIN | 0 | START CASE | 820 |
| No channel test. |
|
|
|
|
|