Skip to Main Content

Incident Search

COGIS - Mechanical Integrity Test Report
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-06123GRAY
B-10
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
1/1/1999
RANGELY
72370
RIO BLANCO  103
NWNW 18 2N102W 6
314558View Related Related
 
Form 21View Related Related View DocsDoc
Date Submitted:5/21/2008MIT Assigned By:KOEHLER, BOB
Date Recv'd:5/22/2008Facility ID: 150200
DocNum:1618800Facility Status:AC
Operator Information:
Oper. No.16700
Operator:CHEVRON U S A INC
Address:6001 BOLLINGER CANYON RD  SAN RAMON  CA 94583
Type Of Facility:UIC ENHANCED RECOVERYWell Status: AC
Facility NameGRAY
Operator contact:DIANE L  PETERSON
Location:  qtrqtr: SENE section: 16 township: 2N range: 103W meridian: 6
MIT Details:
Test Type:5-YEAR UIC TEST
Test Date:5/16/2008
Field Rep:HELGELAND, GARY
Approved Date:8/22/2008
Approved by:KOEHLER, BOB
Last Approved MIT:11/25/2003
Injection/Producing Formation Zones:WEBR
Perforation Interval:NA
Open Hole Interval:6447-7060
Bridge/Cement Plug Depth:NA
Tubing Size:2.875
Tubing Depth:6404
Top Packer Depth:6036
Multiple Packers:Y
 
Condition of approval:
Test Data:Wellbore Channel Test:
Reading TypePressure
10 MIN CASE
5 MIN CASE
CASE BEFORE
FINAL CASE800
FINAL TUBE
INITIAL TUBE
LOSS OR GAIN0
START CASE800
Channel TestTest Date
TRACER SURVEY 3/21/2000