Form 21 | Related Doc | Date Submitted: | 6/4/2008 | MIT Assigned By: | KOEHLER, BOB | Date Recv'd: | 6/9/2008 | Facility ID: | 150200 | DocNum: | 1618720 | Facility Status: | AC | Operator Information: | Oper. No. | 16700 | Operator: | CHEVRON U S A INC | Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 | Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC | Facility Name | NEAL | Operator contact: | DIANE L PETERSON | Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
| MIT Details: | Test Type: | VERIFICATION OF REPAIRS | Repair Type: | OTHER | Repair Desc: | Clean out, stimulate, run new tubing | Test Date: | 5/29/2008 | Field Rep: | | Approved Date: | 6/23/2008 | Approved by: | KOEHLER, BOB | Last Approved MIT: | 5/8/2006 | Injection/Producing Formation Zones: | WEBR | Perforation Interval: | 6762-6445 | Open Hole Interval: | NA | Bridge/Cement Plug Depth: | | Tubing Size: | 2.875 | Tubing Depth: | 5548 | Top Packer Depth: | 5461 | Multiple Packers: | Y | | Condition of approval: | | Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | | 5 MIN CASE | | CASE BEFORE | | FINAL CASE | 805 | FINAL TUBE | 0 | INITIAL TUBE | 0 | LOSS OR GAIN | 0 | START CASE | 805 |
| No channel test. |
|
|
|
|
|