Skip to Main Content

Incident Search

COGIS - Mechanical Integrity Test Report
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-07581FEE
85X
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
1/1/2024
RANGELY
72370
RIO BLANCO  103
SESE 29 2N102W 6
314936View Related Related
 
Form 21View Related Related View DocsDoc
Date Submitted:5/19/2008MIT Assigned By:KOEHLER, BOB
Date Recv'd:5/20/2008Facility ID: 150200
DocNum:1618605Facility Status:AC
Operator Information:
Oper. No.16700
Operator:CHEVRON U S A INC
Address:6001 BOLLINGER CANYON RD  SAN RAMON  CA 94583
Type Of Facility:UIC ENHANCED RECOVERYWell Status: AC
Facility NameFEE
Operator contact:DIANE L  PETERSON
Location:  qtrqtr: SENE section: 16 township: 2N range: 103W meridian: 6
MIT Details:
Test Type:5-YEAR UIC TEST
Test Date:5/15/2008
Field Rep:HELGELAND, GARY
Approved Date:5/21/2008
Approved by:KOEHLER, BOB
Last Approved MIT:5/7/2003
Injection/Producing Formation Zones:WEBR
Perforation Interval:5610-6324
Open Hole Interval:NA
Bridge/Cement Plug Depth:
Tubing Size:2.875
Tubing Depth:6328
Top Packer Depth:5465
Multiple Packers:Y
 
Condition of approval:
Test Data:Wellbore Channel Test:
Reading TypePressure
10 MIN CASE800
5 MIN CASE800
CASE BEFORE
FINAL CASE800
FINAL TUBE
INITIAL TUBE
LOSS OR GAIN0
START CASE800
Channel TestTest Date
TRACER SURVEY 12/5/2001