Form 21 | Related Doc | Date Submitted: | 6/16/2009 | MIT Assigned By: | BROWNING, CHUCK | Date Recv'd: | 7/1/2009 | Facility ID: | 150200 | DocNum: | 1260514 | Facility Status: | AC | Operator Information: | Oper. No. | 16700 | Operator: | CHEVRON U S A INC | Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 | Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC | Facility Name | EMERALD | Operator contact: | DIANE PETERSON | Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
| MIT Details: | Test Type: | ANNUAL UIC TEST | Test Date: | 6/16/2009 | Field Rep: | | Approved Date: | 7/1/2009 | Approved by: | BROWNING, CHUCK | Last Approved MIT: | 9/8/2007 | Injection/Producing Formation Zones: | WEBR | Perforation Interval: | 5614-6361 | Open Hole Interval: | NA | Bridge/Cement Plug Depth: | | Tubing Size: | 2.875" | Tubing Depth: | 6029.9 | Top Packer Depth: | 5474.7 | Multiple Packers: | Y | | Condition of approval: | | Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | | 5 MIN CASE | | CASE BEFORE | | FINAL CASE | 800 | FINAL TUBE | | INITIAL TUBE | | LOSS OR GAIN | -10 | START CASE | 810 |
| No channel test. |
|
|
|
|
|