Form 21 | Related Doc | Date Submitted: | 9/30/2004 | MIT Assigned By: | DIMATTEO, ED | Date Recv'd: | 12/1/2004 | Facility ID: | 150200 | DocNum: | 1196364 | Facility Status: | AC | Operator Information: | Oper. No. | 16700 | Operator: | CHEVRON U S A INC | Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 | Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC | Facility Name | MCLAUGHLIN, S W | Operator contact: | DIANE PETERSON | Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
| MIT Details: | Test Type: | 5-YEAR UIC TEST | Test Date: | 9/28/2004 | Field Rep: | | Approved Date: | 12/1/2004 | Approved by: | DIMATTEO, ED | Last Approved MIT: | N/A | Injection/Producing Formation Zones: | WEBR | Perforation Interval: | 6060-6427 | Open Hole Interval: | NA | Bridge/Cement Plug Depth: | NA | Tubing Size: | 2.875 | Tubing Depth: | 5063 | Top Packer Depth: | 4972 | Multiple Packers: | Y | | Condition of approval: | NEW WELL INITIAL TEST | Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | 810 | 5 MIN CASE | 810 | CASE BEFORE | 0 | FINAL CASE | 810 | FINAL TUBE | 0 | INITIAL TUBE | 0 | LOSS OR GAIN | 0 | START CASE | 810 |
| Channel Test | Test Date | CBL | 7/15/1997 |
|
|
|
|
|
|