Form 21 | Related Doc | Date Submitted: | 5/12/2003 | MIT Assigned By: | KRABACHER, JAY | Date Recv'd: | 9/30/2003 | Facility ID: | 150200 | DocNum: | 1191080 | Facility Status: | AC | Operator Information: | Oper. No. | 16700 | Operator: | CHEVRON U S A INC | Address: | P O BOX 4791 HOUSTON TX 77210 | Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC | Facility Name | CARNEY C T | Operator contact: | DIANE PETERSON | Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
| MIT Details: | Test Type: | 5-YEAR UIC TEST | Test Date: | 5/6/2003 | Field Rep: | KRABACHER, JAY | Approved Date: | 9/30/2003 | Approved by: | KRABACHER, JAY | Last Approved MIT: | 10/1/1998 | Injection/Producing Formation Zones: | WEBR | Perforation Interval: | 5631-6334 | Open Hole Interval: | NA | Bridge/Cement Plug Depth: | | Tubing Size: | 2.875 | Tubing Depth: | 6330 | Top Packer Depth: | 5500 | Multiple Packers: | N | | Condition of approval: | | Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | 820 | 5 MIN CASE | 820 | CASE BEFORE | 0 | FINAL CASE | 820 | FINAL TUBE | 0 | INITIAL TUBE | 0 | LOSS OR GAIN | 0 | START CASE | 820 |
| Channel Test | Test Date | TRACER SURVEY | 9/10/2001 |
|
|
|
|
|
|