| Click for Specifics | Full | 4/3/2026 | 4/13/2026 | | 0 | No Flow | -- | 0 | No Flow | 543 | 543 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404218701 | Form 17 | 5/9/2025 | 5/27/2025 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 975 | 974 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403701641 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |