| 404225804 | Form 17 | 5/13/2025 | 6/2/2025 | PLUNGER LIFT | 1 | CONTINUOUS | GAS | 0 | NO FLOW | 1043 | 1043 | No | -- | -- | Remediation follow up test. 1 PSI gas blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403963745 | Form 17 | 10/18/2024 | 10/21/2024 | FLOWING | 51 | CONTINUOUS | WATER AND LIQUID HYDROCARBON | 1 | WHISPER | 2242 | 2241 | No | -- | -- | Post-Production within 60 days of first sales. 51 PSI fluid flow blew down to 1 PSI in 30 minutes, ~1.25 gallons total. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403931879 | Form 17 | 9/23/2024 | 9/24/2024 | FLOWING | 57 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | WHISPER | 2744 | 2744 | No | -- | -- | Post-Production test within 60 days of first sales. 57 PSI gas and liquid hydrocarbon blew down to 0 PSI within first minute of test, low stream of oily hydrocarbon for the remainder of the test, ~2.5 gallons total. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403701545 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |