| 404384661 | Form 17 | 10/2/2025 | 10/8/2025 | SHUT-IN | 10 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 10 PSI blew down to 0 PSI within first few seconds. No pressure or flow observed for the remainder of the test. |
| 404315238 | Form 17 | 7/25/2025 | 8/13/2025 | SHUT-IN | 50 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | Delayed Completions Test. 50 PSI whisper gas and water trickle blew down to 0 PSI within seconds. Water trickle observed for entire test, ~1 qt. Operator will collect a sample and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404182094 | Form 17 | 4/9/2025 | 4/28/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |
| 404216056 | Form 17 | 3/21/2025 | 5/23/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| 403969538 | Form 17 | 10/24/2024 | 10/24/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |
| 403701548 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |