| 404505546 | Form 17 | 1/7/2026 | 1/14/2026 | FLOWING | 10 | DOWN TO 0 | GAS | 0 | NO FLOW | 451 | 458 | No | -- | -- | |
| 404396653 | Form 17 | 9/23/2025 | 10/20/2025 | PLUNGER LIFT | 16 | CONTINUOUS | GAS | 1 | WHISPER | 746 | 746 | No | -- | -- | Annual test. 16 PSI gas blew down to 1 PSI in thirty minutes, whisper gas observed throughout entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404072066 | Form 17 | 1/7/2025 | 1/28/2025 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 1117 | 1101 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403851746 | Form 17 | 7/3/2024 | 7/11/2024 | | 140 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | DOWN TO 0 | 2641 | 2642 | No | -- | -- | Post-Production within 60 days of first sales. 140 PSI blew down to 0 PSI within thirty minutes of test. Fluid quantity insufficient to sample. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403589834 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |