| Click for Specifics | Full | 9/8/2025 | 9/15/2025 | | 0 | No Flow | -- | 0 | No Flow | 774 | 774 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 3/24/2025 | 3/31/2025 | | 0 | | -- | 0 | | 935 | 935 | No | No | No | |
| 403896093 | Form 17 | 8/12/2024 | 8/21/2024 | FLOWING | 18 | DOWN TO 0 | GAS | 0 | NO FLOW | 2169 | 2169 | No | -- | -- | Post-Production test within 60 days of first sales. 18 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403589916 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |