| 404499665 | Form 17 | 1/6/2026 | 1/8/2026 | FLOWING | 72 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 523 | 522 | No | -- | -- | |
| Click for Specifics | Full | 9/24/2025 | 9/29/2025 | | 11 | Continuous | -- | 0 | No Flow | 686 | 686 | No | No | No | Annual Test. 11 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404060580 | Form 17 | 1/10/2025 | 1/16/2025 | FLOWING | 140 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 1 | CONTINUOUS | 1047 | 1045 | No | -- | -- | Remediation follow up test. 140 PSI continuous gas and liquid hydrocarbon flow blew down to 1 PSI within thirty minutes. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403875904 | Form 17 | 7/25/2024 | 8/2/2024 | | 131 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 2541 | 2556 | No | -- | -- | Post-Production within 60 days of first sales. 131 PSI blew down to 0 PSI in first few seconds, trickle of water observed for first ten minutes then nothing else for the remainder of test. Fluid insufficient to sample. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403589851 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |