| 404499652 | Form 17 | 1/6/2026 | 1/8/2026 | FLOWING | 101 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 425 | 425 | No | -- | -- | |
| 404381341 | Form 17 | 9/23/2025 | 10/7/2025 | PLUNGER LIFT | 95 | CONTINUOUS | MUD AND GAS | 1 | CONTINUOUS | 737 | 737 | No | -- | -- | Annual Test. 95 PSI mud and gas blew down to 1 PSI within thirty minutes of test. Water observed for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404060533 | Form 17 | 1/9/2025 | 1/16/2025 | FLOWING | 11 | WHISPER | GAS | 0 | NO FLOW | 1107 | 1098 | No | -- | -- | Remediation follow up test. 11 PSI whisper blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403863500 | Form 17 | 7/17/2024 | 7/23/2024 | | 80 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 2079 | 2079 | No | -- | -- | Post-Production within 60 days of first sales. 80 PSI water and gas blew down to 0 PSI within thirty minutes of test, ~2 gal of black fluid observed entire test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403589833 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |