| Click for Specifics | Full | 9/24/2025 | 9/29/2025 | | 33 | Continuous | -- | 0 | No Flow | 742 | 742 | No | No | No | Annual Test. 33 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404147603 | Form 17 | 3/17/2025 | 3/31/2025 | FLOWING | 63 | DOWN TO 0 | GAS | 0 | NO FLOW | 1006 | 1027 | No | -- | -- | Remediation follow up test. 63 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403932009 | Form 17 | 9/23/2024 | 9/24/2024 | FLOWING | 64 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 1590 | 1589 | No | -- | -- | Annual test. 64 PSI water and gas flow blew down to 0 PSI in seconds, whisper gas and water continued to trickle for entire test, ~2.5 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403877199 | Form 17 | 7/31/2024 | 8/5/2024 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 2367 | 2365 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403589880 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |