| 404606503 | Form 17 | 3/30/2026 | 4/2/2026 | FLOWING | 60 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 421 | 423 | No | -- | -- | Remediation follow up test. Fluid quantity insufficient to sample. |
| 404385990 | Form 17 | 10/6/2025 | 10/9/2025 | FLOWING | 68 | CONTINUOUS | GAS | 0 | NO FLOW | 710 | 709 | No | -- | -- | High Pressure Verification Test. 68 PSI gas blew down to 0 PSI in five minutes. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| Click for Specifics | Full | 9/15/2025 | 9/29/2025 | | 15 | Continuous | -- | 0 | No Flow | 724 | 724 | No | No | No | Annual Test. 15 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403877150 | Form 17 | 7/29/2024 | 8/5/2024 | FLOWING | 14 | DOWN TO 0 | GAS | 0 | NO FLOW | 2146 | 2145 | No | -- | -- | Post-Production within 60 days of first sales. 14 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403589858 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |