| 404476812 | Form 17 | 12/8/2025 | 12/17/2025 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 6 | 6 | No | -- | -- | |
| Click for Specifics | Full | 5/30/2025 | 6/9/2025 | | 3 | Continuous | -- | 0 | No Flow | 8 | 8 | No | No | No | Annual Test. 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404044174 | Form 17 | 12/12/2024 | 12/31/2024 | FLOWING | 63 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 29 | 30 | No | -- | -- | Post-Production within 60 days of first sales. 63 PSI blew down to 0 PSI in 30 minutes. Whisper gas and water trickle observed throughout entire test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/17/2024 | 6/25/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |