Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-51776George
06N
PDC ENERGY INC
69175
WO
2/26/2025
WATTENBERG
90750
WELD  123
SWNE 21 4N64W 6
482391
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1962 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404565242Form 172/24/20263/3/2026SHUT-IN0NO FLOW NONE0 NO FLOW 10001000No---- 
404291152Form 177/8/20257/23/2025SHUT-IN19DOWN TO 0 WATER AND GAS0 CONTINUOUS 00No----Delayed Completions Test. 19 PSI gas and water blew down to 0 PSI within seconds. Water continued to trickle throughout entire test, ~1 qt. Operator will collect a sample and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
404098321Form 172/7/20252/18/2025SHUT-IN92CONTINUOUS WATER AND GAS1 CONTINUOUS 00No----Delayed Completions Test. 92 PSI water and gas blew down to 1 PSI within thirty minutes. Water and gas observed for entire test. Operator will collect a sample and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
404096547Form 171/29/20252/17/2025SHUT-IN0NO FLOW NONE0 NO FLOW 00No----Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test.
403905284Form 178/29/20248/29/2024SHUT-IN62CONTINUOUS GAS0 NO FLOW 00No----Delayed Completions Test. 62 PSI gas flow blew down to 0 PSI in 5 minutes. No pressure or flow observed for the remainder of the test.
403902381Form 178/21/20248/27/2024 185CONTINUOUS WATER H200 CONTINUOUS 00No----Delayed Completions Test. 185 PSI blew down to 0 PSI in 5 minutes, steady trickle of water throughout entire test. PDC will collect a sample and submit results via Form 43. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull6/17/20246/25/2024 0No Flow--0No Flow00NoNoNoInitial Test Post Rig Release.  0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy.