| 404476647 | Form 17 | 12/8/2025 | 12/17/2025 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 646 | 643 | No | -- | -- | |
| Click for Specifics | Full | 5/29/2025 | 6/9/2025 | | 1 | Continuous | -- | 0 | No Flow | 924 | 932 | No | No | No | Annual Test. 1 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404021321 | Form 17 | 12/6/2024 | 12/9/2024 | FLOWING | 52 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 2776 | 2779 | No | -- | -- | Post-Production within 60 days of first sales. 52 PSI blew down to 0 PSI within thirty minutes of test, whisper gas and water trickle observed for entire test. PDC will schedule a sampling event and submit results via from 43. PDC will monitor bradenhead pressure monthly and submit annual test. |
| Click for Specifics | Full | 6/17/2024 | 6/25/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |