403995622 | Form 17 | 11/13/2024 | 11/14/2024 | GAS LIFT | 2 | DOWN TO 0 | GAS | 0 | NO FLOW | 533 | 531 | No | -- | -- | |
403995682 | Form 17 | 11/12/2024 | 11/14/2024 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 482 | 470 | No | -- | -- | |
403616890 | Form 17 | 11/29/2023 | 12/6/2023 | GAS LIFT | 30 | DOWN TO 0 | -- | 0 | NO FLOW | 193 | 582 | No | -- | -- | blew to zero in 15 seconds |
403210492 | Form 17 | 10/18/2022 | 10/27/2022 | GAS LIFT | 40 | DOWN TO 0 | -- | 0 | NO FLOW | 674 | 706 | No | -- | -- | |
402910960 | Form 17 | 12/28/2021 | 12/28/2021 | FLOWING | 37 | DOWN TO 0 | -- | 0 | NO FLOW | 4 | 3 | No | -- | -- | |
402792071 | Form 17 | 8/18/2021 | 8/25/2021 | SHUT-IN | 5 | DOWN TO 0 | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Bradenhead test prior to toe prep ops. Production casing 0 psi (Nippled Up lower master, casing static during installation). Surface casing 5 psi blew down instantly. No further flow observed, no pressure built. |