403995539 | Form 17 | 11/12/2024 | 11/14/2024 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 689 | 685 | No | -- | -- | |
403601610 | Form 17 | 11/10/2023 | 11/20/2023 | | 0 | NO FLOW | -- | 0 | NO FLOW | 777 | 777 | No | -- | -- | |
403210463 | Form 17 | 10/18/2022 | 10/27/2022 | GAS LIFT | 5 | DOWN TO 0 | -- | 0 | NO FLOW | 738 | 780 | No | -- | -- | |
402910942 | Form 17 | 12/28/2021 | 12/28/2021 | FLOWING | 6 | DOWN TO 0 | -- | 0 | NO FLOW | 151 | 152 | No | -- | -- | |
402792013 | Form 17 | 8/18/2021 | 8/25/2021 | SHUT-IN | 25 | DOWN TO 0 | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Bradenhead test prior to toe prep ops. Production casing 0 psi (Nippled Up lower master, casing static during installation). Surface casing 25 psi blew down instantly. No further flow observed, no pressure built. |