404036200 | Form 17 | 11/12/2024 | 12/19/2024 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 460 | 458 | No | -- | -- | |
403596400 | Form 17 | 11/8/2023 | 11/15/2023 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 566 | 555 | No | -- | -- | |
403245249 | Form 17 | 11/21/2022 | 11/30/2022 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 542 | 541 | No | -- | -- | |
402736682 | Form 17 | 7/1/2021 | 7/1/2021 | FLOWING | 0 | DOWN TO 0 | -- | 0 | NO FLOW | 1792 | 1793 | No | -- | -- | |
402582032 | Form 17 | 1/19/2021 | 1/25/2021 | SHUT-IN | 5 | DOWN TO 0 | VAPOR | 0 | NO FLOW | 0 | 0 | No | -- | -- | Well static and shut-in prior to stimulation. Prod csg @ 0 psi, sfc csg @ 5 psi. Faint hiss when opening bradenhead, bled to zero in 15 seconds. No further flow observed, no pressure built. |
402387352 | Form 17 | 5/1/2020 | 5/1/2020 | SHUT-IN | 0 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | BPV installed in top of production csg and 10k cap installed. Well cased and cemented but not perforated. Prod. csg press assumed 0 psi. Original sfc csg pressure found to be 0 psi. Opened gate valve to blow down, observed no flow and built no pressure. |