| 404413166 | Form 17 | 10/20/2025 | 10/28/2025 | PLUNGER LIFT | 24 | DOWN TO 0 | WATER H20 | 0 | NO FLOW | 369 | 369 | No | -- | -- | Remediation follow up test. 24 PSI water, blew down to 0 within first few seconds. No pressure or flow observed for the remainder of test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403973283 | Form 17 | 10/28/2024 | 10/29/2024 | PLUNGER LIFT | 11 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 411 | 395 | No | -- | -- | Remediation follow up test. 11 PSI water and gas flow blew down to 0 PSI within first minute of test. Water continued to drip for the remainder of the test, ~1 quart total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403846735 | Form 17 | 7/5/2024 | 7/8/2024 | FLOWING | 13 | WHISPER | WATER AND GAS | 0 | WHISPER | 346 | 346 | No | -- | -- | Annual test. 13 PSI water drip and whisper gas flow blew down to 0 PSI in 30 minutes. Fluid quantity insufficient to sample. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 12/20/2023 | 12/26/2023 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 499 | 499 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403158945 | Form 17 | 9/7/2022 | 9/8/2022 | FLOWING | 70 | DOWN TO 0 | GAS | 0 | NO FLOW | 528 | 529 | Yes | -- | -- | Engineering Ad Hoc test. 70 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 1/28/2022 | 2/21/2022 | | 5 | Down to Zero | -- | 0 | Down to Zero | 706 | 726 | No | No | No | |
| Click for Specifics | Full | 8/17/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 962 | 960 | No | None | None | |
| 402930431 | Form 17 | 10/6/2020 | 1/19/2022 | FLOWING | 4 | DOWN TO 0 | -- | 0 | NO FLOW | 1610 | 1610 | No | -- | -- | Post Production within 60 days of first sales, 4 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. (Submitted as part of PDC's ongoing Bradenhead Clean-Up) |
| Click for Specifics | Light | 4/16/2020 | 12/14/2020 | | 32 | | -- | 0 | | 484 | 484 | No | No | No | |
| 402238033 | Form 17 | 11/8/2019 | 11/13/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No fluid, vapor or gas. |