Click for Specifics | Light | 8/10/2024 | 9/19/2024 | | 3 | | -- | 0 | | 271 | 274 | No | No | No | |
Click for Specifics | Light | 8/25/2023 | 9/25/2023 | Plunger Lift | 2 | | -- | 0 | | 280 | 283 | No | No | No | |
403141374 | Form 17 | 8/16/2022 | 8/19/2022 | FLOWING | 30 | DOWN TO 0 | GAS | 0 | NO FLOW | 360 | 360 | No | -- | -- | Mitigation Bradenhead Test
WBD will be submitted |
402748708 | Form 17 | 7/13/2021 | 7/16/2021 | FLOWING | 37 | DOWN TO 0 | GAS | 0 | NO FLOW | 604 | 602 | No | -- | -- | 37 psig initial surface casing pressure. No samples taken. |
402458203 | Form 17 | 7/28/2020 | 8/7/2020 | FLOWING | 22 | DOWN TO 0 | -- | 0 | NO FLOW | 785 | 784 | No | -- | -- | 22 BHP. Down to 0 w/in 5 min. No samples.
|
Click for Specifics | Light | 3/12/2020 | 4/13/2020 | | 8 | | -- | 0 | No Flow | 903 | 903 | No | No | No | |
402002140 | Form 17 | 4/4/2019 | 4/9/2019 | FLOWING | 85 | CONTINUOUS | -- | 0 | NO FLOW | 1800 | 1800 | Yes | Yes | No | First sales
WAS NOT ABLE TO PULL CLEAN SAMPLE OFF OF PRODUCTION CASING DUE TO GREASE IN VALVE |
401919323 | Form 17 | 1/21/2019 | 1/28/2019 | SHUT-IN | 377 | CONTINUOUS | -- | 0 | NO FLOW | 0 | 0 | Yes | Yes | -- | post-drill pre-stim |