403976525 | Form 17 | 10/29/2024 | 10/30/2024 | PLUNGER LIFT | 15 | DOWN TO 0 | GAS | 0 | NO FLOW | 352 | 353 | No | -- | -- | Remediation follow up test. 15 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 12/13/2023 | 12/18/2023 | Plunger Lift | 7 | Down to Zero | -- | 0 | Down to Zero | 429 | 428 | No | No | No | Annual Test. 7 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 1/28/2022 | 2/21/2022 | | 30 | Down to Zero | -- | 0 | Down to Zero | 785 | 802 | No | No | No | |
402894314 | Form 17 | 11/29/2021 | 12/9/2021 | FLOWING | 14 | DOWN TO 0 | VAPOR | 0 | NO FLOW | 848 | 848 | No | -- | -- | Abatement system follow up test, 14 PSI vapor flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
Click for Specifics | Full | 8/17/2021 | 11/1/2021 | | 22 | Down to Zero | -- | 0 | No Flow | 1000 | 1000 | No | None | None | |
402499287 | Form 17 | 9/20/2020 | 9/29/2020 | FLOWING | 114 | GAS | -- | 0 | NO FLOW | 1560 | 1560 | No | -- | -- | Post production test, 114 PSI gas flow blew down to 0 PSI within first 5 min of test no pressure or flow observed for the remainder of test. PDC will attempt to collect a sample as submit results via form 43 as soon as possible. PDC will follow up with a remediation plan via sundry. |
402163718 | Form 17 | 8/29/2019 | 9/3/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No gas, fluid or vapor. Post-drill, pre-frac bradenhead test. |