| 404399854 | Form 17 | 10/13/2025 | 10/22/2025 | PLUNGER LIFT | 12 | DOWN TO 0 | GAS | 0 | NO FLOW | 304 | 305 | No | -- | -- | Remediation follow up test. 12 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403976395 | Form 17 | 10/29/2024 | 10/30/2024 | PLUNGER LIFT | 18 | DOWN TO 0 | GAS | 0 | NO FLOW | 377 | 385 | No | -- | -- | Remediation follow up test. 18 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 12/13/2023 | 12/18/2023 | Plunger Lift | 12 | Down to Zero | -- | 0 | Down to Zero | 435 | 432 | No | No | No | Annual Test. 12 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403214264 | Form 17 | 10/31/2022 | 11/1/2022 | FLOWING | 16 | DOWN TO 0 | GAS | 0 | NO FLOW | 540 | 539 | No | -- | -- | Abatement system follow up test. 16 PSI gas flow blew down to 0 PSI within first minute of test through 1/2" needle valve. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. Sample collected 2/15/2022. For wellbore diagram, see doc# 402896499. |
| 403115432 | Form 17 | 7/19/2022 | 7/25/2022 | FLOWING | 13 | DOWN TO 0 | GAS | 0 | NO FLOW | 572 | 572 | No | -- | -- | Abatement system follow up test, 13 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details when due in 11/2022. Sample collected 2/15/2022. PDC will continue to monitor monthly. For wellbore diagram, see doc# 402896499. |
| 403052602 | Form 17 | 5/17/2022 | 5/18/2022 | GAS LIFT | 54 | CONTINUOUS | GAS | 0 | NO FLOW | 540 | 540 | No | -- | -- | Abatement system follow up test, 54 PSI slight gas flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. Sundry due 11/24/2022. PDC collected a sample 2/15/2022. PDC will continue to monitor monthly. See doc # 402896499 for Wellbore Diagram. |
| 402943272 | Form 17 | 1/31/2022 | 2/1/2022 | PLUNGER LIFT | 62 | CONTINUOUS | -- | 2 | WHISPER | 612 | 612 | No | -- | -- | Annual Test, 62 PSI whisper blew down to 2 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402881368 | Form 17 | 11/24/2021 | 11/29/2021 | FLOWING | 55 | DOWN TO 0 | VAPOR | 0 | NO FLOW | 656 | 653 | No | -- | -- | Abatement system follow up test, 55 PSI vapor flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 8/18/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 761 | 763 | No | None | None | |
| 402499316 | Form 17 | 9/20/2020 | 9/29/2020 | FLOWING | 82 | GAS | -- | 0 | NO FLOW | 1437 | 1437 | No | -- | -- | Post production test, 82 PSI gas flow blew down to 0 PSI within first 5 min of test no pressure or flow observed for the remainder of test. PDC will attempt to collect a sample as submit results via form 43 as soon as possible. PDC will follow up with a remediation plan via sundry. |
| 402163658 | Form 17 | 8/29/2019 | 9/3/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No gas, fluid or vapor. Post-drill, pre-frac bradenhead test. |