Click for Specifics | Light | 6/6/2024 | 7/23/2024 | | 0 | | -- | 0 | | 1104 | 1104 | No | No | No | |
Click for Specifics | Light | 6/2/2023 | 7/17/2023 | Plunger Lift | 0 | | -- | 0 | | 854 | 854 | No | No | No | |
Click for Specifics | Light | 2/22/2022 | 3/22/2022 | Shut-In | 0 | | -- | 0 | | 931 | 931 | No | No | No | |
Click for Specifics | Light | 1/26/2021 | 2/16/2021 | Flowing | 1 | | -- | 0 | NO FLOW | 516 | 526 | No | No | No | |
402301247 | Form 17 | 1/27/2020 | 2/4/2020 | FLOWING | 30 | DOWN TO 0 | -- | 0 | NO FLOW | 862 | 851 | No | -- | -- | Annual. 30 psig initial surface casing pressure. Blew down to 0 psig within five minutes. No samples taken. |
402038106 | Form 17 | 4/30/2019 | 5/10/2019 | FLOWING | 61 | WHISPER | -- | 0 | NO FLOW | 1193 | 1194 | Yes | Yes | No | First Sales. 61 psig initial surface casing. Down to 0 psig in five minutes. Gas sample taken. Crestone will submit a Form 4 sundry with a mitigation plan by 06-29-2019 per COGCC Order No. 1-232 NTO Guidance.
|
401881865 | Form 17 | 12/18/2018 | 12/20/2018 | SHUT-IN | 35 | WHISPER | -- | 4 | NO FLOW | 0 | 0 | Yes | Yes | -- | post drill pre-stim |