403999653 | Form 17 | 11/18/2024 | 11/19/2024 | | 4 | DOWN TO 0 | GAS | 0 | NO FLOW | 701 | 700 | No | -- | -- | Remediation follow up test. 4 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403963737 | Form 17 | 10/18/2024 | 10/21/2024 | PLUNGER LIFT | 3 | CONTINUOUS | GAS | 0 | NO FLOW | 564 | 606 | No | -- | -- | Remediation follow up test. 3 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403812974 | Form 17 | 6/3/2024 | 6/4/2024 | | 61 | CONTINUOUS | GAS | 0 | NO FLOW | 707 | 707 | No | -- | -- | Engineering Ad Hoc test. 61 PSI blew down to 0 PSI within 10 minutes of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly.
|
Click for Specifics | Full | 5/4/2023 | 5/15/2023 | | 4 | Down to Zero | -- | 0 | Down to Zero | 591 | 591 | No | None | None | Annual Test. 4 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403051862 | Form 17 | 5/11/2022 | 5/17/2022 | FLOWING | 8 | DOWN TO 0 | GAS | 0 | NO FLOW | 1217 | 1217 | No | -- | -- | Test after DOFP. Whisper on open for 7 minutes and died. No flow for remainder of test. |
402908455 | Form 17 | 12/21/2021 | 12/23/2021 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. Vacuum on open for 22 seconds. |