Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-45250ROBIN
9-16HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
SI
10/1/2022
WATTENBERG
90750
WELD  123
SESE 9 1N65W 6
441273
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1848 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull10/22/202411/12/2024 6ContinuousNone--No Flow00NoNN Tubing Shut in. Casing dead. Surface Casing produced no liquid.
Click for SpecificsFull9/28/202310/16/2023Plunger Lift4ContinuousNone--No Flow00NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull10/14/202211/8/2022Plunger Lift2ContinuousNone--No Flow00NoNN Surface Casing produced no liquid.
Click for SpecificsFull6/3/20217/19/2021Plunger Lift1WhisperNone--No Flow00NoNN Casing dead. Surface Casing produced no liquid.
402480606Form 179/2/20209/16/2020 1WHISPER --0 NO FLOW 11No----Surface Casing produced no liquid.
402000034Form 173/4/20194/8/2019PLUNGER LIFT166GAS --1 GAS 20111996No----Surface casing produced no fluids. Well shut in for 15 minutes ended with 32 PSI. Blew down surface casing an extra 30 minutes ended with a whisper.
401769246Form 179/13/20189/20/2018 160GAS --1 WHISPER 00No----Surface casing produced no fluids. Blew down surface casing an extra 30 min ended with a whisper. Surface casing shut in for 15 min ended with 45 PSI.
401645657Form 175/9/20185/18/2018PLUNGER LIFT317GAS --1 WHISPER 00No----Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with 174 PSI. Well and master shut in.
401517596Form 171/11/20181/17/2018 12GAS --0 DOWN TO 0 11Yes----Surface casing produced no fluids. Surface casing shut in for 15 minutes ended with 6 PSI. Master valve was shut. Post drill Form 17