Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-44568NEWBY
2N-33HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
11/1/2024
WATTENBERG
90750
WELD  123
SWSE 33 3N68W 6
449884
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 805 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
403952231Form 1710/2/202410/10/2024 0NO FLOW NONE0 NO FLOW 189189No----Tubing Shut in. Surface Casing produced no liquid.
403913282Form 178/21/20249/9/2024 35CONTINUOUS LIQUID HYDROCARBON1 WHISPER 33923390No----Surface Casing produced Liquid Hydrocarbon. Liquid Hydrocarbon insufficient for sampling.
403895778Form 178/9/20248/21/2024 276CONTINUOUS WATER H200 NO FLOW 28582841No----Surface Casing produced water.
Click for SpecificsFull9/6/202310/16/2023Plunger Lift15ContinuousNone--No Flow477483NoNN Surface Casing produced no liquid.
Click for SpecificsFull5/25/20226/13/2022Plunger Lift22ContinuousLiquid Hydrocarbon--No Flow12131209NoNN Surface Casing produced Liquid Hydrocarbon. Liquid Hydrocarbon insufficient for sampling.
Click for SpecificsFull6/28/20217/19/2021Plunger Lift20ContinuousLiquid Hydrocarbon--Whisper12081210NoNN Surface Casing produced Liquid Hydrocarbon. Liquid Hydrocarbon insufficient for sampling.
Click for SpecificsFull3/24/20206/8/2020 6Continuous Flow 0Down To Zero992992NoNoNoTubing shut in. Surface casing produced no liquid.
Click for SpecificsFull2/6/201912/10/2019 6Gas 1Whisper (Very Low Flow)14941494YesYesNoSurface casing produced condensate insufficient for sampling.
401826333Form 1710/29/201811/5/2018 95WATER H20 --0 DOWN TO 0 22062206No----SURFACE CASING PRODUCED WATER. SHUT IN FOR 15 MIN; ENDED WITH A WHISPER.
401662727Form 176/2/20186/5/2018 1CONTINUOUS --0 DOWN TO 0 ----No----Surface casing produced condensate. Surface casing shut in for 15 min ended with a whisper. Production casing was tied in to hard line.