| 404601178 | Form 17 | 3/26/2026 | 3/31/2026 | SHUT-IN | 17 | CONTINUOUS | GAS | 0 | NO FLOW | 250 | 250 | No | -- | -- | Pre PA test |
| 404309566 | Form 17 | 7/29/2025 | 8/7/2025 | SHUT-IN | 18 | CONTINUOUS | GAS | 0 | NO FLOW | 243 | 243 | No | -- | -- | Remediation follow up test. 18 PSI gas blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404097581 | Form 17 | 1/30/2025 | 2/18/2025 | PLUNGER LIFT | 53 | DOWN TO 0 | GAS | 0 | NO FLOW | 254 | 254 | No | -- | -- | Engineering Ad Hoc test. 53 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 5/16/2024 | 5/30/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 216 | 216 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/21/2023 | 6/28/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 204 | 202 | No | No | No | |
| Click for Specifics | Full | 5/26/2022 | 6/13/2022 | | 0 | No Flow | -- | 0 | No Flow | 198 | 194 | No | None | None | |
| 402846232 | Form 17 | 10/19/2021 | 10/19/2021 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 289 | 289 | No | -- | -- | Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402735474 | Form 17 | 1/28/2021 | 7/1/2021 | FLOWING | 97 | CONTINUOUS | GAS | 0 | | 358 | 358 | No | -- | -- | Post-Production - Monthly Follow-up. 97 PSI blew down with gas to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. |
| Click for Specifics | Light | 12/10/2020 | 12/14/2020 | | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
| Click for Specifics | Light | 4/18/2019 | 8/18/2020 | | 16 | | -- | 0 | | 655 | 655 | No | No | No | |
| 401442275 | Form 17 | 10/16/2017 | 10/26/2017 | FLOWING | 100 | WHISPER | -- | 0 | NO FLOW | 2761 | 2761 | No | -- | -- | Post production Test, pressure blew down to 0PSI within forst 5 minutes of test |
| 401348305 | Form 17 | 7/14/2017 | 7/20/2017 | SHUT-IN | 175 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre Completion Test initial pressure 650 PSI BLEED TO 0 PSI WITHIN seconds no flow for duration of test |