Click for Specifics | Full | 5/17/2024 | 5/30/2024 | | 13 | Whisper (very low flow) | -- | 0 | Down to Zero | 231 | 229 | No | No | No | Annual Test. 13 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403391210 | Form 17 | 5/1/2023 | 5/2/2023 | PLUNGER LIFT | 153 | WHISPER | GAS | 8 | WHISPER | 338 | 340 | Yes | -- | -- | Abatement system follow up test. 153 PSI whisper gas blew down to 8 PSI in 30 minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly, a sample was collected 02/02/2023. |
403227658 | Form 17 | 11/10/2022 | 11/14/2022 | SHUT-IN | 86 | DOWN TO 0 | GAS | 0 | NO FLOW | 344 | 344 | Yes | -- | -- | Abatement system follow up test. 86 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
403035747 | Form 17 | 5/2/2022 | 5/3/2022 | SHUT-IN | 102 | CONTINUOUS | GAS | 0 | NO FLOW | 372 | 372 | Yes | -- | -- | Abatement system follow up test, 102 PSI slight gas flow blew down to 0 PSI within first 20 minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
402830428 | Form 17 | 9/28/2021 | 10/4/2021 | | 134 | WHISPER | GAS AND VAPOR | 0 | NO FLOW | 430 | 430 | Yes | -- | -- | Annual Test, 134 PSI slight gas blew down to 0 PSI within first 10 minutes of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly |
402425186 | Form 17 | 2/14/2020 | 6/17/2020 | | 3 | DOWN TO 0 | -- | 0 | NO FLOW | 409 | 405 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402114759 | Form 17 | 6/30/2019 | 7/18/2019 | FLOWING | 225 | DOWN TO 0 | -- | 0 | NO FLOW | 585 | 585 | No | -- | -- | Annual Test 225 PSI blew down to 0 PSI in seconds. No pressure or flow observed for the duration of the 30 min test, PDC will attempt to collect a sample and submit via form 43. PDC has submitted a remediation plan via sundry |
401347772 | Form 17 | 7/14/2017 | 7/19/2017 | SHUT-IN | 800 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre Completion Test initial pressure 800 PSI BLEED TO 0 PSI WITHIN seconds no flow for duration of test |
401327853 | Form 17 | 5/15/2017 | 6/29/2017 | SHUT-IN | 700 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre Completion test. Initial pressure was 700 PSI, instantly blew down within first minute of test to 0 PSI. No pressure for remainder of test. Attempted to collect sample but were unable to due instant blow down. |