Click for Specifics | Full | 9/17/2024 | 10/1/2024 | | 0 | No Flow | -- | 0 | No Flow | 536 | 527 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 3/21/2023 | 4/10/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 400 | 497 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
Click for Specifics | Full | 2/3/2022 | 2/21/2022 | | 0 | No Flow | -- | 0 | No Flow | 403 | 401 | No | No | No | |
402717178 | Form 17 | 4/10/2021 | 6/14/2021 | GAS LIFT | 0 | NO FLOW | -- | 0 | | 616 | 618 | No | -- | -- | Abatement system follow up test, 0 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
402508747 | Form 17 | 10/9/2020 | 10/12/2020 | | 100 | DOWN TO 0 | -- | 0 | NO FLOW | 720 | 720 | Yes | -- | -- | Annual Test 100 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
Click for Specifics | Light | 5/6/2019 | 8/18/2020 | | 9 | | -- | 0 | | 1691 | 1691 | No | No | No | |