404000705 | Form 17 | 11/13/2024 | 11/20/2024 | | 10 | DOWN TO 0 | GAS | 0 | NO FLOW | 347 | 349 | No | -- | -- | Remediation follow up test. 10 PSI gas blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 5/15/2024 | 5/30/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 268 | 269 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
403643630 | Form 17 | 1/2/2024 | 1/3/2024 | PLUNGER LIFT | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 306 | 305 | No | -- | -- | Abatement system follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 5/23/2023 | 5/29/2023 | | 0 | No Flow | -- | 0 | No Flow | 279 | 279 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 8/31/2022 | 9/6/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 307 | 307 | No | None | None | |
Click for Specifics | Full | 3/12/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 493 | 495 | No | None | None | |
402420893 | Form 17 | 3/15/2020 | 6/12/2020 | | 0 | DOWN TO 0 | -- | 0 | NO FLOW | 579 | 579 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402229101 | Form 17 | 10/11/2019 | 11/1/2019 | FLOWING | 140 | WHISPER | -- | 0 | NO FLOW | 832 | 832 | No | -- | -- | Annual Test 140 PSI blew down to 0 PSI within forst minute of test. No pressure or flow observed for the remainder oftest. PDC Will attempt to collect a sample and submit results via from 43. PDC has submitted a remediation plan via sundry. |