403799413 | Form 17 | 5/15/2024 | 5/21/2024 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 219 | 219 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy.
|
Click for Specifics | Full | 5/23/2023 | 5/29/2023 | | 7 | Down to Zero | -- | 0 | No Flow | 276 | 277 | No | None | None | Annual Test. 7 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403260527 | Form 17 | 12/8/2022 | 12/14/2022 | PLUNGER LIFT | 6 | DOWN TO 0 | GAS | 0 | NO FLOW | 214 | 219 | No | -- | -- | Annual Test. 6 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
Click for Specifics | Full | 3/9/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 360 | 357 | No | None | None | |
402420942 | Form 17 | 5/7/2020 | 6/12/2020 | | 6 | DOWN TO 0 | -- | 0 | NO FLOW | 464 | 473 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
Click for Specifics | Light | 4/5/2020 | 5/11/2020 | | 19 | | -- | 19 | | 485 | 485 | No | No | No | |
402263048 | Form 17 | 12/6/2019 | 12/13/2019 | SHUT-IN | 85 | WHISPER | -- | 0 | NO FLOW | 591 | 593 | No | -- | -- | Annual Test, 85 PSI blew down to 0 within forst 5 min of test, no pressure or flow observed for the remaining 25 min of test. PDC will re-test and attempt to collect a sample. PDC will sunmit a remediation plan via sundry. |