Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-43439Alles
22L-241
PDC ENERGY INC
69175
PR
10/1/2025
WATTENBERG
90750
WELD  123
NESE 22 5N65W 6
327103
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1646 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404292827Form 177/14/20257/24/2025PLUNGER LIFT0NO FLOW NONE0 NO FLOW 465465No----Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy.
403866806Form 177/18/20247/26/2024PLUNGER LIFT2WHISPER WATER AND GAS0 WHISPER 269271No----Annual test. 2 PSI slight fluid drip and low gas whisper for entire test, ~8 oz total fluid. Fluid quantity insufficient to sample. PDC will monitor pressure and re-test according to bradenhead policy.
403310083Form 172/1/20232/2/2023SHUT-IN0DOWN TO 0 GAS0 NO FLOW 344344No----Abatement system follow up test. 0 PSI, no pressure or flow observed. PDC will submit sundry with bradenhead details if needed as soon as possible. PDC will continue to monitor monthly.
403069874Form 175/25/20226/7/2022PLUNGER LIFT24CONTINUOUS WATER AND GAS0 CONTINUOUS 257257Yes----Annual Test, 24 PSI water and gas flow blew down to 0 PSI within first few seconds of test. No pressure observed for the remainder of the test. Water present for the remainder of the test, approximately 1.5 gallons produced. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
402863032Form 1711/4/202111/5/2021PLUNGER LIFT8WHISPER VAPOR1 WHISPER 341341Yes----Abatement system follow up test, 8 PSI continuous whisper vapor flow blew down to 1 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
402795814Form 171/2/20218/30/2021PLUNGER LIFT75CONTINUOUS WATER H200 NO FLOW 390365Yes----Post-production, 75 PSI water flow blew down to 0 PSI within first 5 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43.
Click for SpecificsLight7/19/202012/3/2020 0 --0No Flow544544NoNoNo 
Click for SpecificsLight4/15/20198/18/2020 0 --0 11001100NoNoNo 
401327585Form 176/16/20176/29/2017FLOWING10DOWN TO 0 --0 NO FLOW 22362236No---- 
401247117Form 173/29/20173/30/2017SHUT-IN0NO FLOW --0 NO FLOW 17501750No----All sleeves are open due to the toe prep