Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-43386Clark
14J-203
PDC ENERGY INC
69175
PR
6/1/2020
WATTENBERG
90750
WELD  123
NWNE 14 5N65W 6
323242
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1545 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404583055Form 173/9/20263/17/2026SHUT-IN106DOWN TO 0 WATER AND GAS0 NO FLOW 419419No---- 
404111487Form 172/20/20252/28/2025SHUT-IN0NO FLOW NONE0 NO FLOW 294294No----Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull3/14/20244/1/2024 40Down to Zero--0No Flow261260NoNoNoAnnual Test.  40 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403349897Form 173/15/20233/20/2023PLUNGER LIFT220DOWN TO 0 WATER AND GAS20 WHISPER 270265Yes----Annual Test. 220 PSI water and gas flow blew down to 20 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
Click for SpecificsFull3/14/20224/18/2022 38Down to Zero--0Down to Zero308294NoNoNo 
402815998Form 179/15/20219/20/2021PLUNGER LIFT33DOWN TO 0 --0 NO FLOW 334335No----Abatement system follow up test, 33 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402789434Form 174/21/20218/24/2021PLUNGER LIFT25CONTINUOUS WATER AND GAS0 NO FLOW 390390No----Annual Test, 25 PSI water and gas flow blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly.
402425805Form 174/27/20206/18/2020 0WHISPER --0 VAPOR 485485No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402236443Form 1711/7/201911/12/2019FLOWING560GAS --0 NO FLOW 672672YesYes--Annual Test 560 PSI with gas flow for 20 min of the 30 min test. 0 PSI at the end of the 30 min. PDC has collected a sample and will submit resulta via form 43, PDC Will submit remediation plan via sundry.
401347266Form 177/2/20177/19/2017FLOWING580CONTINUOUS --0 NO FLOW 20452044No----Post Production test, intitial pressure 580 PSI instantly bled down to 0 PSI no flow for duration of test
401237255Form 172/22/20173/20/2017SHUT-IN800VAPOR --0 NO FLOW 00No----