Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-43087Schaumberg
17F-332
PDC ENERGY INC
69175
SI
6/1/2024
WATTENBERG
90750
WELD  123
SWNW 17 5N64W 6
445225
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1496 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404221897Form 175/12/20255/29/2025SHUT-IN20DOWN TO 0 WATER AND GAS0 CONTINUOUS 337336No----Remediation follow up test. 20 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403799438Form 175/16/20245/21/2024SHUT-IN36DOWN TO 0 WATER AND GAS0 CONTINUOUS 277279No----Annual test. 36 PSI water and gas flow blew down to 0 PSI in seconds, water was steady stream for entire test, ~3 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy.
403448698Form 176/27/20236/28/2023PLUNGER LIFT31DOWN TO 0 WATER AND GAS0 CONTINUOUS 249245No----Annual Test. 31 PSI gas blew down to 0 PSI within first few seconds of test. A trickle of water was observed throughout test. No pressure observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403240142Form 1711/21/202211/28/2022PLUNGER LIFT20DOWN TO 0 WATER AND GAS0 CONTINUOUS 307307Yes----Abatement system follow up test. 20 PSI gas and water flow blew down to 0 PSI within first few seconds of test. Water trickled for entire test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
403060127Form 175/25/20225/26/2022PLUNGER LIFT56CONTINUOUS WATER AND GAS0 CONTINUOUS 234234Yes----Annual Test, 56 PSI water and gas flow blew down to 0 PSI within first minute of test. Water continued for the duration of the test in steady stream. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
402735325Form 174/14/20217/1/2021SHUT-IN83WHISPER --0  400400No----Post-Production - Monthly Follow-up. 83 PSI blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible.
402735329Form 173/30/20217/1/2021SHUT-IN30DOWN TO 0 WATER H200 NO FLOW 415406No----Post-Production - Monthly Follow-up. 30 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible.
402456118Form 177/24/20207/29/2020SHUT-IN100GAS --0 NO FLOW 480480No----Abatement System Follow up test, 100 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months.
402225150Form 1710/26/201910/29/2019FLOWING200DOWN TO 0 --0 NO FLOW 700700No----Annual test 200 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC has collected a sample and will submit results via form 43. PDC will submit a remediation plan via sundry.
401249221Form 173/30/20174/3/2017FLOWING140DOWN TO 0 --0 NO FLOW 22172217No---- 
401123238Form 179/16/201610/4/2016SHUT-IN320GAS --0 NO FLOW 00No----