Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-42903Cecil&
39;s Kersey Farm
17K-402
PDC ENERGY INC
69175
PR
1/1/2022
WATTENBERG
90750
KERSEY/WELD  123
NWSW 17 5N64W 6
445139
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1646 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull5/15/20245/30/2024 4Down to Zero--0No Flow249250NoNoNoAnnual Test.  4 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull5/1/20235/8/2023 4Down to Zero--0No Flow353353NoNoneNoneAnnual Test. 4 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull5/25/20226/13/2022 3Down to Zero--0No Flow451450NoNoneNone 
Click for SpecificsFull9/5/202111/1/2021 0Down to Zero--0No Flow500500NoNoneNone 
Click for SpecificsLight7/12/202012/3/2020 12 --0No Flow334334NoNoNo 
Click for SpecificsLight6/13/20198/18/2020 30 --0 539539NoNoNo 
401440778Form 1710/15/201710/25/2017FLOWING600DOWN TO 0 --0 NO FLOW 17661766YesYes--Post Production Test, gas sample collected. Blew down to zero within 30 seconds. Requested 14 day blowdown period.
401347622Form 177/14/20177/19/2017SHUT-IN650DOWN TO 0 --0 NO FLOW 00No----Pre Completion Test initial pressure 650 PSI BLEED TO 0 PSI WITHIN 2 MINUTES no flow for duration of test
401327680Form 175/12/20176/29/2017SHUT-IN230DOWN TO 0 --0 NO FLOW 00No----Pre Completion test. Initial pressure was 230 PSI, instantly blew down within first minute of test to 0 PSI. No pressure for remainder of test. Attempted to collect sample but were unable to due instant blow down.