Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-42688Connie
26E-402
PDC ENERGY INC
69175
SI
1/1/2025
WATTENBERG
90750
WELD  123
NWNW 26 5N64W 6
444694
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1469 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404182530Form 174/9/20254/29/2025PLUNGER LIFT29CONTINUOUS GAS1 WHISPER 904904No----Remediation follow up test. 29 PSI whisper gas and water flow blew down to 1 PSI within thirty minutes. Operator will monitor pressure and re-test according to bradenhead policy.
403774146Form 174/19/20244/30/2024 20DOWN TO 0 GAS0 NO FLOW 897897No----Abatement system follow up test. 20 PSI gas flow blew down to zero in the first five minutes. PDC will continue to monitor monthly.
Click for SpecificsFull5/2/20235/8/2023 0No Flow--0No Flow867868NoNoneNoneAnnual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull5/16/20226/13/2022 38Down to Zero--0Down to Zero302299NoNoneNone 
402808517Form 179/12/20219/13/2021PLUNGER LIFT0NO FLOW --0 NO FLOW 335335No----Annual Test, 0 psi with no pressure or flow observed for the entire 30 minute test. PDC will continue to monitor monthly.
402418388Form 174/1/20206/10/2020 8DOWN TO 0 --0  469--No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
Click for SpecificsLight3/12/20205/11/2020 6 --6 477477NoNoNo 
402074331Form 173/26/20196/13/2019FLOWING400CONTINUOUS --0 NO FLOW 605607No----Annual Test 400 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
401992968Form 173/26/20194/2/2019FLOWING400GAS --0 NO FLOW 605607Yes----Annual bradenhead test 400PSI blew down to zero. PDC will submit remediation proposal via sundry.
401190453Form 171/14/20171/20/2017FLOWING640CONTINUOUS --0 NO FLOW 23342336No---- 
401176744Form 1712/22/20161/3/2017FLOWING730CONTINUOUS --0 NO FLOW 26302647No---- 
401064233Form 176/8/20166/17/2016SHUT-IN175CONTINUOUS --0 NO FLOW 00No----