| 404477118 | Form 17 | 12/8/2025 | 12/17/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | |
| 404450636 | Form 17 | 10/22/2025 | 11/25/2025 | SHUT-IN | 16 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | |
| 404330015 | Form 17 | 8/6/2025 | 8/26/2025 | SHUT-IN | 95 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Abatement System Follow-up Test. 95 PSI gas blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404285916 | Form 17 | 6/30/2025 | 7/18/2025 | SHUT-IN | 335 | DOWN TO 0 | GAS | 0 | WHISPER | 210 | 210 | No | -- | -- | Pre-P&A. 335 PSI gas flow blew down to 0 PSI within first few seconds, whisper gas continued for entire test. Operator will schedule a sampling event and submit results via form 43. |
| 404098652 | Form 17 | 2/6/2025 | 2/18/2025 | SHUT-IN | 303 | CONTINUOUS | GAS | 0 | WHISPER | 0 | 0 | No | -- | -- | Engineering Ad Hoc test. 303 PSI gas blew down to 1 PSI in thirty minutes. Gas was present the entire test. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| Click for Specifics | Full | 4/29/2024 | 5/6/2024 | | 0 | No Flow | -- | 0 | No Flow | 454 | 454 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/22/2024 | 4/30/2024 | | 0 | No Flow | -- | 0 | No Flow | 545 | 545 | No | No | No | |
| Click for Specifics | Full | 4/18/2023 | 4/24/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 199 | 198 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| 403135415 | Form 17 | 8/12/2022 | 8/15/2022 | PLUNGER LIFT | 67 | DOWN TO 0 | GAS | 0 | NO FLOW | 237 | 237 | Yes | -- | -- | Annual Test, 67 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 402753459 | Form 17 | 5/8/2021 | 7/20/2021 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | | 272 | 272 | No | -- | -- | Annual Test, 0 psi with no flow observed for 30 minutes. |
| Click for Specifics | Light | 8/11/2020 | 12/3/2020 | | 2 | | -- | 0 | No Flow | 320 | 320 | No | No | No | |
| 402418350 | Form 17 | 1/13/2020 | 6/10/2020 | | 0 | NO FLOW | -- | 0 | | 445 | -- | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402059581 | Form 17 | 4/7/2019 | 5/30/2019 | FLOWING | 200 | DOWN TO 0 | -- | 0 | NO FLOW | 384 | 384 | No | -- | -- | Annual Test, 200 PSI blew down to 0 PSI instantly 0 PSI after 30 min. A followup sundry porposing a remediation plan will be submitted within 10 days. |